BlueLine gif Hard Rule

OPI gifSchool Facilities Condition Inventory

Home   

Lefttopcurve righttopcurve

Document Location: http://www.opi.mt.gov/facilities/Index.html
Last Modified: 8/15/08

Red Lodge School
Timeline:
August 23, 2006 Survey became available online
September 15, 2006 Deadline to complete survey
October 12-13, 2006 Survey Summary provided to Interim Legislative Finance Committee
December, 2007 Phase 2 Begins

During the December 2005 Special Session, the legislature appropriated funds to conduct a facilities condition inventory.  This study is administered by Architecture and Engineering Division of the Department of Administration in two phases.

Phase 1 is a brief survey completed by each school district in 2006.  The survey asked for basic information on the school buildings in each district.  This information has been compiled and will be used as baseline data for Phase 2.

Phase 2, beginning December 2007, is an on-site assessment of all K-12 school facilities and their associated support structures in Montana.  These assessments will be conducted at each school site by the DLR Group in addition to various local architecture and engineering firms. 

The final report of Phase II assessment results will be presented to the State Legislature by June 30, 2008, and copies will be available to all school districts.

For more information contact:
Denise Ulberg 444-1960
Paul Taylor 444-1257